![]() please enroll your child in the district's Before School Care Program. Should you require supervision prior to 8:35 a.m. Only staff, parents with appointments, and students enrolled in the Early Start program will be allowed to enter the building before 8:35 a.m. ![]() ![]() since supervision is not provided before that time. Students are not to arrive at school prior to 8:35 a.m. All students are to enter the school through the main entrance at the front of the building. Please do not drop off your children prior to 8:35 a.m. The hours for school are 8:55 AM-3:20 PM. Wayne Township Elementary Schools Discipline Policy.> More construction and traffic coverageĬopyright 2023 by WDIV ClickOnDetroit - All rights reserved. This will avoid overlapping projects at the M-5/US-24 intersection. The rebuilding part of the US-24 project will be completed this year and then work will move to the US-24/M-102 (8 Mile Road) interchange. The work is being coordinated with the Telegraph Road (US-24) project between I-96 and 8 Mile Road (M-102). The two-year project in Detroit, Livonia, and Redford Township, includes three miles of hot-mix asphalt resurfacing, joint repairs, concrete curb and gutter repairs, storm sewer replacement, and Americans with Disabilities Act (ADA) ramp upgrades.Ĭrews will work on sewers and sidewalk ramps this year, but the majority of the project is scheduled to take place in 2024. 7, Grand River Avenue (M-5) will have the far right lanes closed in each direction between west of Lahser Road and 8 Mile Road (M-102) for sidewalk ramp work and sewer work. – Work to resurface Grand River Avenue between 8 Mile Road and Berg Road in Wayne County will begin next month.īeginning at 6 a.m.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |